VAL VERDE • S14664-01

01SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

06SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

13SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

15SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

20SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

22SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

27SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

29SEP
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

11OCT
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

11OCT
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

13OCT
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

13OCT
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

21OCT
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

21OCT
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

25OCT
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

25OCT
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

27OCT
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

27OCT
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

03NOV
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

03NOV
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.


08NOV
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.


10NOV
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.



22NOV
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

29NOV
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

01DEC
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

13DEC
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

22DEC
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

10JAN
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

12JAN
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

26JAN
Inspection
Final Inspection for Quality Assurance. Testing and certification. Road Test, Pump Test and Suspension Test.