PIPE CREEK • S14705-01

26JUL
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

26JUL
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

28JUL
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

28JUL
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

02AUG
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

02AUG
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

04AUG
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

04AUG
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.