LAS LUNAS • 14586

16MAR
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

18MAR
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

23MAR
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

25MAR
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

30MAR
Electrical
The wiring harness is installed. Emergency and scene lighting are mounted and terminated at the breaker panel.



08APR
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.


13APR
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.


15APR
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.